Thor Digital
6
SDMET Series Manual V1.0
INSTALLATION
System Installer must adhere to Article 820-40 of the NEC that provides
guidelines for proper grounding and specifies that the cable ground shall
be connected to the grounding system of the building, as close to the
point of cable entry as possible
.
UNPACKING and INSPECTION
Each unit is shipped factory tested. Ensure all items are removed from the container prior to
discarding any packing material.
Thoroughly inspect the unit for shipping damage with particular attention to connectors and
controls. If there is any sign of damage to the unit or damaged or loose connectors contact
your distributor immediately. Do not put the equipment into service if there is any indication of
defect or damage
.
PRODUCT PICTURES and DIAGRAMS
SDMET-901
SDMET-902