www.THORav.us | sales@thorav.us | (763) 999-4253
™ & ® 2018 THOR AV. © 2022 THOR AV.
12
Insert Latch Guide Pins into receiving holes on Flybar and adjacent panels. Align panels and lock into position by twisting the Latch Guide Pin. Do not over
tighten. Continue until first row is complete. For additional rows, align panels and lock into position.
Push latch lever, on Flybar or panel, to lock or release Latch Guide Pins. New Latch lever may need to be pushed in and out a few times for Latch Guide Pins
to properly secure into place.
Verify LED panels are aligned before tightening into place.
LEVEL
4
6
5
FLOWN APPLICATION - USING FLYBAR