LFE1220-US, -EU, and -UK Laminar Flow Enclosures
Chapter 3: Installation
Rev A August 2020
Page 39
3.9. Fitting Curtains
3.9.1. Required Parts:
Code
Description
Qty
H
Curtain Strip
44
M
Curtain Clamp – Short
2
N
Curtain Clamp – Long
2
AC
Hammer Head Screw
48
AE
M6 Domed Nut
48
AF
M6 Washer
56
3.9.2. Long Side Curtain Assembly
41. Insert the first Hammer Head Screw (AC) into the centre slot. Have the long edge of the hammerhead parallel to
the slot and insert, then rotate (clockwise) to prevent it from falling out. The gap between the frame upright and the
edge of Hammer Head Screw should be approx. 6.5mm [0.26"].
Figure 39 Inserting a Hammer Head Screw on the Long Side of the Frame
Summary of Contents for LFE1220-EU
Page 60: ...www thorlabs com ...