LFE1220-US, -EU, and -UK Laminar Flow Enclosures
Chapter 3: Installation
Rev A August 2020
Page 41
44. Add a third Curtain Strip on top of the first two assembled to cover the gap.
Figure 42 Hanging the Next Curtain Strip
45. Repeat steps 43 and 44 until the whole side is covered with curtains (14 strips in total). This overlapping pattern
is important to help with access through the curtains.
Figure 43 Hanging the Remaining Curtain Strips
Summary of Contents for LFE1220-EU
Page 60: ...www thorlabs com ...