3
1.
Locate bus connection (HPT and FP only) and
cable as shown. Cut end of cable at angle to aid
in piercing grommet. Leave additional cable for
expansion loop. See page 5 for multiple cable
installation tips.
5.
Insert banding guide into expediter and snap
into place.
3.
Insert cable into expediter. If mounted on
bottom or side of pipe, punch out weep hole.
4.
Slide expediter toward pipe and route cable
through support base entry.
8.
Terminate cable with appropriate PETK
termination kit. Refer to PETK installation
instructions. Push excess cable back through
expediter. Tighten cap securely. Tape cable
expansion loop to pipe.
6.
Mount expediter to pipe using pipe band. Do
not band over cable.
7.
Cut off end of cable.
Terminator
TM
ZT-P-XP
INSTALLATION PROCEDURES
9.
Remove expediter from pipe by removing pipe
band.
2.
For HPT and FP cable, exchange grommet in
Terminator with grommet provided in PETK-3-ZT.
GRW
GRW-G/Tstat