Introduction
Introduction
Introduction
Introduction
Commissioning
Commissioning
Commissioning
Commissioning
25-Jul-00
25-Jul-00
25-Jul-00
25-Jul-00
Page
Page
Page
Page 5-1
5-1
5-1
5-1
5
Commissioning
5.1
Introduction
Before attempting to use the equipment, the commissioning pa-
pers should be send to the relevant authority.
It is recommended that a Link Test (or Performance Verification
Test in Inmarsat terminology) is run before using the equipment.
The Link Test automatically verifies that the TT-3020C Capsat
Transceiver is capable of both receiving and transmitting infor-
mation according to Inmarsat-C specifications. No other tests are
required.
The Inmarsat Mobile Number is needed to run the Link Test.
When a new unit is being installed, it is the responsibility of the
service technician to verify that the unit is functioning properly,
and that the unit is commissioned and logged into the Inmarsat-C
System, at the end of installation.
You should only attempt to start one Link Test yourself as you
have only three commissioning attempts, and these will be used
up if you are not cautious.
5.2
The first Login
Your
first Login
attempt will be recognised by the Network Co-
ordinating Station (NCS) and served normally, (downloading a
Land Earth Station (LES) network table into the Transceiver) and
inform the Network Database that the new unit is present and
being commissioned.