USERS MANUAL NOVA SERIES
DONGGUAN THUNDER LASER EQUIPMENT CO.,LTD
Shatian Town, Shatian Dadao, Mintian
Tel :(86)769 826653
Dongguan City, Guangdong Province, China
29
29
3.8.5
Connecting the Cooling System
①
Open the Toolbox, and then take out the water pipes, water-error signal cable and
chiller power cable.
②
One of the water pipes, please connect to the water chiller where marked as
“OUTLET”, the other side of the pipe connect to the machine where marked as
“Water IN”.
③
The other pipe, please connect
to “INLET” of water chiller and “Water OUT” of
machine.
④
The Water-error signal cable, please
connect to “ALARM OUTLET” of water chiller
and machine.
⑤
The chiller power cable, please connect to the chiller.
⑥
Add pure (distilled) water into the chiller until the water level in the green area
showing on the gauge. Run chiller for a period of time, the water will fill into the
laser tube on the machine, please re-add water to keep the water level in the green
area.