USERS MANUAL NOVA SERIES
DONGGUAN THUNDER LASER EQUIPMENT CO.,LTD
Shatian Town, Shatian Dadao, Mintian
Tel :(86)769 826653
Dongguan City, Guangdong Province, China
77
5.6 Maintenance Plan
1.
DAILY CHECK LIST
①
Check Mirrors and lens for condensation and make sure it is clean after work
②
Check exhaust grille to ensure there is no blockage for exhaust fan
③
Check coolant water level
④
Check air filter on compressor
⑤
Ensure cooling fans on sides are free from debris
⑥
The air blower must be checking and cleaning if required.
2.
WEEKLY CHECK LIST
①
Clean filters on water chiller
②
Clean debris from under laser bed
③
Clean X & Y & Z axis rails and lubricate as required
④
Clean Acrylic/Tempered glass covers in lid
⑤
The beam combiner must be checking every weekly, and cleaning if required.
THE END