MODEL 1601 SERIES COFFEE BREWER
COMPONENT MAINTENANCE MANUAL
WITH ILLUSTRATED PARTS LIST
25-30-27
Page 701
September 1, 2005
ASSEMBLY
1. General
NOTE:
Soldering may be necessary in the assembly procedures.
NOTE:
Observe proper ESD handling and storage procedures for PCB assemblies
after removing top cover. ESD Discharges may damage PCB assemblies.
NOTE:
TIA recommends after any disassembly and reassembly of the 1601 Series
Coffee Brewers, a complete functional test be performed on the microwave
oven. Refer to the Testing and Troubleshooting section of this manual.
2.
Assembly Instructions for
Model 1601
A. Top Cover and Cold Water Tray Assembly (Figure 1001)
1. Install receptacle (15) to top cover (10) with screws (20).
2. Align gasket (30) onto cold water tray (25).
3. Install top cover (10), top cover gasket (30) and cold water tray (25) with
screws (35).
B. Water Tank Assembly (Figure 1001)
1. Install sight gauge tube (200) into fitting (205).
2. Attach water tank (355) with screws (360).
3. Install tank washer (365) onto tank (355). Insert brew tubing (255) through
the tank assembly (355). Install brew tube (255) into barbed adapter (45).
4. Ensure proper orientation and install check valve (250) into tubing (255).
5. Install tubes (255) into heater casting (100).
C. Brew Head Assembly (Figure 1001)
1. Install barbed adapter (50) into the hot water receptacle (40).