ELECTRICAL SYSTEMS
4-6
53 FLYBRIDGE
7RFRPELQHEDWWHU\EDQNV
Lo-
cate the ACR (
Figure 4-5
) and,
with the ellow verride nob in
starboard position,
push the center o the button until
latched (
Figure 4-7
.
7R SUHYHQW DXWRPDWLF RSHUD
-
WLRQ
otate the ellow verride
nob to
port posi
-
tion (
Figure 4-8
.
To isolate battery banks that
DUHFRPELQHG
Rotate the Yel-
low verride nob to
port position
Figure 4-8
to release the center button rom
the button will pop out . hen rotate the ellow verride nob bac to
starboard position
Figure 4-6
.
7RVHFXUHIRUVHUYLFLQJ
otate the ellow verride nob to
port
position
Figure 4-8
. ass a cable tie through the hole.
WHEN BATTERY BANKS ARE INTERCONNECTED, ALL NON-ESSEN-
TIAL LOADS SHOULD BE TURNED OFF UNTIL THE PROBLEM WITH
THE FAILED BANK IS CORRECTED. FAILURE TO DO SO CAN RE-
SULT IN RAPID DEPLETION OF THE BATTERY POWER NEEDED TO
SAFELY OPERATE THE BOAT. FAILURE TO DO SO MAY RESULT IN
PERSONAL INJURY OR DEATH.
WARNING
!
4.1.6 Operating Notes
onitor your battery voltages when you first arrive at your boat and periodically
while using your boat. or
batteries, voltages below volts with no load on
the ban may indicate a problem condition that is preventing battery replenish
-
ment. nvestigate and correct the problem immediately.
LOCK OFF
REMOTE
Figure 4-8:
in
M
Summary of Contents for FLYBRIDGE 53 2019
Page 4: ...This page intentionally left blank ...
Page 6: ...This page intentionally left blank ...
Page 12: ...SAFETY LABEL LOCATIONS iv 53 FLYBRIDGE 1 FLYBRIDGE 16 16 4 5 6 10 11 12 13 16 3 ...
Page 18: ...SAFETY LABEL LOCATIONS x 53 FLYBRIDGE This page intentionally left blank ...
Page 56: ...EQUIPMENT AND FEATURES 1 28 53 FLYBRIDGE This page intentionally left blank ...
Page 65: ...BELOW DECK FEATURES EQUIPMENT 2 9 53 FLYBRIDGE Figure 2 8 VIP head Figure 2 9 Utility room ...
Page 102: ...OPERATING YOUR BOAT 5 20 53 FLYBRIDGE This page intentionally left blank ...
Page 114: ...COMMISSIONING YOUR BOAT 6 12 53 FLYBRIDGE 7KLV SDJH LQWHQWLRQDOO OHIW EODQN ...
Page 136: ...ROUTINE MAINTENANCE 7 22 53 FLYBRIDGE 7KLV SDJH LQWHQWLRQDOO OHIW EODQN ...
Page 159: ...DATE MAINTENANCE REPAIR LOG OPERATING HOURS APPENDIX C MAINTENANCE SCHEDULES C 3 53 FLYBRIDGE ...
Page 160: ...DATE MAINTENANCE REPAIR LOG OPERATING HOURS APPENDIX C MAINTENANCE SCHEDULES C 4 53 FLYBRIDGE ...
Page 161: ...DATE MAINTENANCE REPAIR LOG OPERATING HOURS APPENDIX C MAINTENANCE SCHEDULES C 5 53 FLYBRIDGE ...
Page 162: ...DATE MAINTENANCE REPAIR LOG OPERATING HOURS APPENDIX C MAINTENANCE SCHEDULES C 6 53 FLYBRIDGE ...
Page 163: ...Appendix D BOATING ACCIDENT REPORT D 1 53 FLYBRIDGE ...
Page 164: ...APPENDIX D BOATING ACCIDENT REPORT D 2 53 FLYBRIDGE ...
Page 165: ...APPENDIX D BOATING ACCIDENT REPORT D 3 53 FLYBRIDGE ...
Page 166: ...APPENDIX D BOATING ACCIDENT REPORT D 4 53 FLYBRIDGE ...
Page 167: ...APPENDIX D BOATING ACCIDENT REPORT D 5 53 FLYBRIDGE ...
Page 168: ...APPENDIX D BOATING ACCIDENT REPORT D 6 53 FLYBRIDGE ...
Page 169: ...Appendix E FLOAT PLAN E 1 53 FLYBRIDGE ...
Page 170: ...APPENDIX E FLOAT PLAN E 2 53 FLYBRIDGE ...
Page 172: ...Operator Notes APPENDIX E FLOAT PLAN E 4 53 FLYBRIDGE ...