6
Solar Panel/Carriage Assembly for the TP250/400 Hoist
Refer to the TP250/400 Owners Manual instructions; determine hoist height needed and follow the track assembly
instructions. Place the assembled hoist/carriage (without solar brackets) in the appropriate work site location. Place the
base section at the proper “Base to Building” distance stated in the owners manual.
Due to the size and positioning of the solar panels the Secondary Handle Kit (#48468) is required for operator safety. If
the secondary handle has not already been installed, do it now. Please follow the installation instructions included in the
hoist owners manual.
Solar Panel
Mounting
Locations
Secondary
Handle Kit
Brackets
Carriage Tabs
Solar Panel Tabs
Shown from the back
Step #1
Carefully place one solar panel bracket over the “Tabs” shown on the carriage. There are also locking tabs on the back side of the solar panel
brackets. Once in position the solar panel brackets should rest in the proper mounting position. Repeat for the other solar panel bracket.
Step #2
From the front: insert bolt into the mounting hole
located just inside the tab. There are two bolts/
nuts per bracket. Fasten with nut and tighten both
nuts. Repeat for the other solar panel bracket.
Step #3
Attach brake and secondary handles.
(404) 344-0000 • www.tranzsporter.com