Pag. 2 / 70
DMAN802000093-Manual MB250 Hydro Wood-Pellet STD11
Revision Date
Description
09/11/2018
Condition to enter Modulation and Standby in hydraulic plant 11 have been modified
Cleaning Engine and Cleaning Engine 2 in Check up have been added
Night Modality has been added
Parameter A25 has been added
14/09/2018
Added Service, Cleaning, Working Hours, Ignition entries in Monitor Menu
24/07/2018
Introduction of V14 parameter
12/07/2018
Introduction of the Brazier Cleaning Engine in Check Up (P51 parameter)
Introduction of T25 timer. During this time exhaust fan2 works at power VS14 after
transition from Pellet to Wood in Combi 2 modality
Introduction of A49 parameter in order to remove Buffer Thermostat management
in Wood modality
Introduction of A51 enabling parameter for the management of Er02 error during
Wood modality
The management of Thermostat L01 validation while decreasing has been modified
during the Stabilization phase
Introduction of the Cleaning On message during periodic cleaning phase
Configuration 11 has been added
20/04/2018
Boiler probe thermostat maximum range increased, NTC 231K probe added
Automatic Extinguishing function modified
Door management modified