BEFORE YOU GET STARTED

Please retain instructions for future reference

05

04

tigersheds.com

0113 205 4189

sales@tigersheds.com

TOOLS REQUIRED

We recommend using the following tools (not supplied):

SCREW

FIXING PACK CONTENTS:

•  From the outside working in, cut banding holding all components together and remove the Module Packs.

  Note: parts may have become loose or moved during transportation.

•  Large items like doors and windows are screwed into cross brace. Remove screws as you come to
  corresponding Module Pack to reduce the risk of falling components.

•  All Module Packs are individually banded together. For ease, remove from vertical position on pallet and cut 
  Module Pack banding when on a horizontal surface.

RUBBER MALLET

DRILL

LADDER

TAPE MEASURE

SHARP KNIFE

SPIRIT LEVEL

13mm Galvanised Clout Nails

(C13) x80

25mm Black Screws

(S25) x16

35mm Screws

(S35) x200

30mm Galvanised Nails

(N30) x140

30mm Galvanised Nails

(N40) x20

40mm Screws

(S40) x24

50mm Screws

(S50) x18

IMPORTANT

•  Before assembly please make sure you have a suitable base ready to erect your building on.
•  This base MUST be level and flat to ensure that the building is assembled properly and lines up.

•  Please carefully unpack the components in your delivery, and remove the untreated timber supports that make up the
 

boxed pallet.

• 

DO NOT

 start your build until you have checked that all the parts of your building are present and in a suitable condition.

•  If you are organising a third party to install your building, it is best practice not to schedule this immediately on receipt of your 
 

order, to give you time to check your delivery.

BUILDING PACK CONTENTS:

For full details of what should be included please see the Module Pack List that is supplied with the delivery. They 
are also available on request in pdf form from our helpful Customer Support team – please call 0113 2054189 for 
Customer Support or use the Items Delivered Query form at 

tigersheds.com/contact.

Cross Brace

HAMMER

WOOD SAW

Summary of Contents for TIGERFLEX NOVA

Page 1: ...TIGERFLEX NOVA LOGCABIN 12 x6 GENERAL ASSEMBLY INSTRUCTIONS...

Page 2: ...r be at least 25mm above the surrounding ground level to avoid flooding TYPES OF BASE Durable plastic grid Concrete 75mm laid on top of 75mm hard core Slabs laid on 50mm of sharp sand Timber Base Self...

Page 3: ...d Nails N30 x140 30mm Galvanised Nails N40 x20 40mm Screws S40 x24 50mm Screws S50 x18 IMPORTANT Before assembly please make sure you have a suitable base ready to erect your building on This base MUS...

Page 4: ...9 sales tigersheds com Flexible Format DOOR WINDOW POSITIONING MODULE PACKS A B D Q Lay out the module packs supplied in the position you would like them to be constructed See following examples for s...

Page 5: ...09 08 tigersheds com 0113 205 4189 sales tigersheds com BEFORE YOU GET STARTED PRE ASSEMBLY Please retain instructions for future reference B Q A D Q D B B B Q B D Q A D B...

Page 6: ...tanalised floor bearer floor jointing piece using 4x 35mm S35 screws Step 2 FLOOR ASSEMBLY MODULE PACKS H Place half logs as shown 4 Required Secure to tanalised floor bearer through notch at end usi...

Page 7: ...ues are equal your frame is square Make any adjustments if required until values are equal Step 4 FLOOR ASSEMBLY MODULE PACKS H Q Take 3 floorboards and tack in place as shown below using 30mm N30 gal...

Page 8: ...the door on a side leave full board in place S35 Step 8 WALL ASSEMBLY STAGE 2 MODULE PACKS A B D F Q T Once 6 logs high use 274mm cut logs to start building window frame Secure through notch into log...

Page 9: ...tops using 2x 35mm S35 screws per spacer as shown Pic H S35 S35 S35 S35 Step 10 ROOF PANEL INSTALLATION MODULE PACK K Hook roof panels into notches at apex of gable tops Roof panels should be flush w...

Page 10: ...p 12 WINDOW INSTALLATION Offer window up to the opening as shown Make sure window is positioned centrally resting on the last full log within the opening Note There will be a gap either side to allow...

Page 11: ...to skirt jointing section Please retain instructions for future reference 12 x6 TIGERFLEX NOVA LOG CABIN INSTRUCTIONS 21 20 tigersheds com 0113 205 4189 sales tigersheds com O P N S50 S35 Step 15 JOIN...

Page 12: ...rden building we recommend maintaining your timber treatment with TigerSkin preserver This solvent based wood treatment will penetrate deep into the wood giving years of protection against the weather...

Page 13: ...Local Display Agent Woodlands DIY Store Station Yard Horsforth Leeds LS18 5NZ Telephone 0113 205 4189 Website tigersheds com Email customersupport tigersheds com...

Reviews: