background image

09

08

tigersheds.com

0113 205 4189

sales@tigersheds.com

BEFORE YOU GET STARTED - PRE ASSEMBLY

Please retain instructions for future reference

B

Q

A

D

Q

D

B

B

B

Q

B

D

Q

A

D

B

Summary of Contents for TIGERFLEX NOVA

Page 1: ...TIGERFLEX NOVA LOGCABIN 12 x6 GENERAL ASSEMBLY INSTRUCTIONS...

Page 2: ...r be at least 25mm above the surrounding ground level to avoid flooding TYPES OF BASE Durable plastic grid Concrete 75mm laid on top of 75mm hard core Slabs laid on 50mm of sharp sand Timber Base Self...

Page 3: ...d Nails N30 x140 30mm Galvanised Nails N40 x20 40mm Screws S40 x24 50mm Screws S50 x18 IMPORTANT Before assembly please make sure you have a suitable base ready to erect your building on This base MUS...

Page 4: ...9 sales tigersheds com Flexible Format DOOR WINDOW POSITIONING MODULE PACKS A B D Q Lay out the module packs supplied in the position you would like them to be constructed See following examples for s...

Page 5: ...09 08 tigersheds com 0113 205 4189 sales tigersheds com BEFORE YOU GET STARTED PRE ASSEMBLY Please retain instructions for future reference B Q A D Q D B B B Q B D Q A D B...

Page 6: ...tanalised floor bearer floor jointing piece using 4x 35mm S35 screws Step 2 FLOOR ASSEMBLY MODULE PACKS H Place half logs as shown 4 Required Secure to tanalised floor bearer through notch at end usi...

Page 7: ...ues are equal your frame is square Make any adjustments if required until values are equal Step 4 FLOOR ASSEMBLY MODULE PACKS H Q Take 3 floorboards and tack in place as shown below using 30mm N30 gal...

Page 8: ...the door on a side leave full board in place S35 Step 8 WALL ASSEMBLY STAGE 2 MODULE PACKS A B D F Q T Once 6 logs high use 274mm cut logs to start building window frame Secure through notch into log...

Page 9: ...tops using 2x 35mm S35 screws per spacer as shown Pic H S35 S35 S35 S35 Step 10 ROOF PANEL INSTALLATION MODULE PACK K Hook roof panels into notches at apex of gable tops Roof panels should be flush w...

Page 10: ...p 12 WINDOW INSTALLATION Offer window up to the opening as shown Make sure window is positioned centrally resting on the last full log within the opening Note There will be a gap either side to allow...

Page 11: ...to skirt jointing section Please retain instructions for future reference 12 x6 TIGERFLEX NOVA LOG CABIN INSTRUCTIONS 21 20 tigersheds com 0113 205 4189 sales tigersheds com O P N S50 S35 Step 15 JOIN...

Page 12: ...rden building we recommend maintaining your timber treatment with TigerSkin preserver This solvent based wood treatment will penetrate deep into the wood giving years of protection against the weather...

Page 13: ...Local Display Agent Woodlands DIY Store Station Yard Horsforth Leeds LS18 5NZ Telephone 0113 205 4189 Website tigersheds com Email customersupport tigersheds com...

Reviews: