background image

12’x6’ TIGERFLEX

®

 NOVA LOG CABIN INSTRUCTIONS

Please retain instructions for future reference

13

12

tigersheds.com

0113 205 4189

sales@tigersheds.com

Step 3:

FLOOR ASSEMBLY

(MODULE PACK: B)

•  Take 3 full logs from Module Pack B and slot them into place as shown. 

Do not secure with screws

.

•  Decide at this point where you would like your door to be positioned. If you plan on having it on one of the 

  gable ends, place your first floorboard at the door end chosen. Leaving approx. 2mm gap at the edges.

Step 5:

FLOOR ASSEMBLY

•  Measure corner to corner diagonally to make sure cabin floor is square. If both values are equal, your frame is 
  square. Make any adjustments if required until values are equal.

Step 4:

FLOOR ASSEMBLY

(MODULE PACKS: H & Q)

•  Take 3 floorboards and tack in place as shown below using 30mm 

(N30) 

galvanised Nails.

 

Do not fully secure as these are only to keep the floor square before installing remaining floorboards.

•  Align the inner floor bearers so that they are equal across the floor.

N30

N30

1

1

2

2

Step 6:

FLOOR ASSEMBLY

(MODULE PACKS: H & Q)

•  From the “Door Board” 

(see Stage 3)

 work your way across the frame, securing remaining

  floorboards using 10x 30mm 

(N30)  

galvanised nails per floorboard. 

 

Note: you will need to remove the 2 floorboards and logs that were

  used to hold the frame together as you come to them.

•  Final floorboard may need to be trimmed.
  Measure as shown and cut to size. 

(Pic D)

D

N30

Summary of Contents for TIGERFLEX NOVA

Page 1: ...TIGERFLEX NOVA LOGCABIN 12 x6 GENERAL ASSEMBLY INSTRUCTIONS...

Page 2: ...r be at least 25mm above the surrounding ground level to avoid flooding TYPES OF BASE Durable plastic grid Concrete 75mm laid on top of 75mm hard core Slabs laid on 50mm of sharp sand Timber Base Self...

Page 3: ...d Nails N30 x140 30mm Galvanised Nails N40 x20 40mm Screws S40 x24 50mm Screws S50 x18 IMPORTANT Before assembly please make sure you have a suitable base ready to erect your building on This base MUS...

Page 4: ...9 sales tigersheds com Flexible Format DOOR WINDOW POSITIONING MODULE PACKS A B D Q Lay out the module packs supplied in the position you would like them to be constructed See following examples for s...

Page 5: ...09 08 tigersheds com 0113 205 4189 sales tigersheds com BEFORE YOU GET STARTED PRE ASSEMBLY Please retain instructions for future reference B Q A D Q D B B B Q B D Q A D B...

Page 6: ...tanalised floor bearer floor jointing piece using 4x 35mm S35 screws Step 2 FLOOR ASSEMBLY MODULE PACKS H Place half logs as shown 4 Required Secure to tanalised floor bearer through notch at end usi...

Page 7: ...ues are equal your frame is square Make any adjustments if required until values are equal Step 4 FLOOR ASSEMBLY MODULE PACKS H Q Take 3 floorboards and tack in place as shown below using 30mm N30 gal...

Page 8: ...the door on a side leave full board in place S35 Step 8 WALL ASSEMBLY STAGE 2 MODULE PACKS A B D F Q T Once 6 logs high use 274mm cut logs to start building window frame Secure through notch into log...

Page 9: ...tops using 2x 35mm S35 screws per spacer as shown Pic H S35 S35 S35 S35 Step 10 ROOF PANEL INSTALLATION MODULE PACK K Hook roof panels into notches at apex of gable tops Roof panels should be flush w...

Page 10: ...p 12 WINDOW INSTALLATION Offer window up to the opening as shown Make sure window is positioned centrally resting on the last full log within the opening Note There will be a gap either side to allow...

Page 11: ...to skirt jointing section Please retain instructions for future reference 12 x6 TIGERFLEX NOVA LOG CABIN INSTRUCTIONS 21 20 tigersheds com 0113 205 4189 sales tigersheds com O P N S50 S35 Step 15 JOIN...

Page 12: ...rden building we recommend maintaining your timber treatment with TigerSkin preserver This solvent based wood treatment will penetrate deep into the wood giving years of protection against the weather...

Page 13: ...Local Display Agent Woodlands DIY Store Station Yard Horsforth Leeds LS18 5NZ Telephone 0113 205 4189 Website tigersheds com Email customersupport tigersheds com...

Reviews: