TIGERFLEX
®
SHIPLAP APEX BIKE SHED ASSEMBLY GUIDE
14
tigersheds.com
0113 205 4189
sales@tigersheds.com
Step 8:
FELT INSTALLATION
• Roll out felt along lower part of roof, leaving sufficient
overhang to fold down onto roof purlin, approx
75mm/3”.
Do not fold underneath roof.
• Use clout
(CN13)
nails to tack top of felt into the roof panel.
• Repeat for the other side. Fold the overhang at gable
ends under the roof panel and tack in place.
• Ridge piece should overlap the lower strips and
tack into place (if supplied).
Step 9:
BARGE BOARD & FINIAL INSTALLATION
• Fit Barge Boards to the roof, trapping
overhanging end of the felt in between
to create a weatherproof seal.
• Secure together using 2x 40mm
(N40)
nails per Barge Board.
• Fit Finials at the apex point of the
Barge Boards. Secure together using
2x 40mm
(N40)
nails per finial.
CN13
N40