11
Please retain instructions for future reference
Step 2:
FLOOR ASSEMBLY
(MODULE PACKS: H & J)
• Place half logs as shown - 2x 1750mm & 4x 1150mm Required.
• Secure to tanalised floor bearer through notch at end using 1x 50mm
(S50)
screws per notch.
(Pic B)
• Using a Stanley knife, cut a slight notch in the top groove and screw through log into tanalised floor bearer
using 1x 50mm
(S50)
screws per notch.
(Pic C)
S50
Notch
& Screw
Through.
C
B
B
Screw Through