14
tigersheds.com
0113 205 4189
sales@tigersheds.com
Step 7:
WALL ASSEMBLY STAGE 1
(MODULE PACKS: A, B, C, D, E, F, Q & T)
• For central sections, use notched logs from
Module Pack Q
.
• Secure through notch into log below using 1x 50mm
(S50)
screw
per notch, then secure into floorboards. Angle drill pilot hole
then screw in place as shown using 1x 50mm
(S50)
screw per cut
log.
(Pic E)
ADDITIONAL STEPS FOR DOOR POSITIONING.
• If you are having the door in an end, remove the full log used
for boarding floor and replace with 2x cut logs as shown.
Insert 2x 190mm spacers under door logs.
• If you are having the door on a side leave full board in place.
S35
14’x6’ TIGERFLEX
®
ZORA LOG CABIN INSTRUCTIONS
• Build up back wall, gables and front wall as shown.
• Tie back wall together with 190mm spacers, every 3rd log fitted,
using 2x 35mm
(S35)
screws per spacer.
(Pic F)
Cut Log x 2
Notched Floor Log x 4
S50
S50
E
S35
S35
F
S50