Installing Impression Rail

 Express

Open Mid-Rail Aluminum Railing System

Standard Open Mid-Rail System 

Each Panel Requires:

•  36" X 6' Panel Kit

•  One additional Bottom Snap

•  One unpunched H-Channel

•  Rail Attach Kit (one kit for two panels)

•  6 Deck Rail Clips per bay 

 

Continuous Top Rail Open Mid-Rail System 

Each Panel Requires:

•  36" X 6' or 8' Continuous Top Rail Panel Kits

•  One additional Bottom Snap

•  One unpunched H-Channel

•  Rail Attach Kit (one kit for two panels)

•  Continuous Top Rail (span up to 18')

•  5 Deck Rail Clips per bay

•  One Crossover Bracket

Important Note:

Prior to construction, check with your local regulatory agency for special code requirements in your area.

Common railing height is 36" or 42". Post spans will vary depending on job site conditions. Never span more than 8' on-center between railing 

posts. Spans longer than 12' in length will require reduced post spans. When you cut a kit to create two panels, for instance, cutting 8' to two 4', 

you will need an additional hardware kit. Read instructions completely to get an understanding of how the product goes together and how each 

piece affects the other.

Important Information

• Please read all instructions completely before starting any part of the installation. Always make sure to visit www.TimberTech.com to 

ensure you are viewing the most current installation instructions, care and cleaning, technical information and more.

• Impression Rail Express should be installed using the same good building principles used to install wood, composite, or metal railing and 

in accordance with the local building codes and the installation guidelines included below.

• The AZEK Co. LLC accepts no liability or responsibility for the improper installation of this product.
• Impression Rail Express may not be suitable for every application and it is the sole responsibility of the installer to be sure that Impression 

Rail is fit for the intended use. Since all installations are unique, it is also the installer’s responsibility to determine specific requirements in 

regards to each rail application.

• The AZEK Co. LLC recommends that all applications be reviewed by a licensed architect, engineer or local building official before 

installation. If you have any questions or need further assistance, please call AZEK Customer Service at 877-ASK-AZEK (877-275-2935), 

or visit our website at www.TimberTech.com.

• Impression Rail Express is tested as a whole system and should be used that way. It is not intended to be used in conjunction with other 

railing systems or fasteners.

• The following Installation Guidelines are applicable for installation of Impression Rail Express only.
• IMPORTANT: Make sure the DRIVE TOOL/DRILL is configured or set to use the SCREW setting when driving and/or tightening all 

FASTENERS.

• SAFETY: Always wear goggles when handling, cutting, drilling and fastening materials.
• Failure to install this product in accordance with applicable building codes and Impression Rail Express’s written Rail Install Guide may 

lead to personal injury, affect rail system performance and void the product warranty.

• The buildup or generation of static electricity is a naturally occurring phenomenon in many plastic based products such as carpeting, 

upholstery, and clothing, and can occur on alternative decking under certain environmental conditions. This static electricity can discharge 

once contact is made with hardware, railing, or other conductors of electricity.

Summary of Contents for Impression Rail Express

Page 1: ...Impression Rail Express Installation Guide Aluminum Posts 4 Level Panels 8 Stair Panels 11 TimberTech com Open Mid Rail...

Page 2: ...ded below The AZEK Co LLC accepts no liability or responsibility for the improper installation of this product Impression Rail Express may not be suitable for every application and it is the sole resp...

Page 3: ...IRING MUST BE INSTALLED PRIOR TO SECURING POSTS TO DECK STAIR SURFACE AND INSTALLING TOP RAIL SNAPS It is the responsibility of the installer to meet all local code requirements and obtain all require...

Page 4: ...led Dia 4 Pre drill 3 16 holes for post attachment fasteners sold separately 5 8 hole for lighting wires optional Dia 3C TOP VIEW Determine All Posts Needed and Prepare end center or corner Important...

Page 5: ...gap between post and wall to be less than a 4 opening Dia 6 Install 90 degree Corner Posts Position post on same 3 centerline typical and temporarily fasten using a single fastener through base plate...

Page 6: ...Dia 10 PLAN VIEW CLOSE UP VIEW CENTER LINE Install 45 Corner Posts Post to be installed at 22 5 to accommodate a 45 angle Position post on same 3 centerline typical and temporarily fasten to deck surf...

Page 7: ...Screws Dia 12C 12D Repeat for lower clips Install base plate vinyl cover only after railing assembly is completed Dia 4 8 9 Dia 11 3 CENTERLINE TYPICAL DECK EDGE Secure 2 Posts to Deck center only For...

Page 8: ...nels Clamp or hold panel against post adjust for equal end spacing Dia 1 Determine the desired center of the rail either a baluster hole or between two baluster holes Dia 2 Measuring from the determin...

Page 9: ...IL 4X 8 X 3 4 TEK SCREW STRAIGHT CLIP EMBLED AND FASTENED IN ACCORDANCE WITH ULTRALOX S INSTALLATION INSTRUCTIONS ARE BLACK WHITE BRONZE REVISIONS BALLOONS DENOTE CHANGES REV DESCRIPTION DATE APPROVED...

Page 10: ...G SCREWS POST RAIL PANEL CLIP 2 POST DETAIL CROSSOVER BRACKET 4X BASE MOUNTING SCREWS MOUNTING STRUCTURE 2 POST 2 POST BASE 2 BASE SKIRT Wall Mounts optional Use Wall Mounts if attaching level railing...

Page 11: ...etween two baluster holes Dia 1C Measuring from the determined center cut both ends of the rails Position stair panel approximately 1 1 2 above stair nosing Tip lay a 2x4 board flat on nose of stair t...

Page 12: ...SELF DRILLING SCREWS OUTSIDE INSTALL 2X 8 X 3 4 SELF DRILLING SCREWS Dia 5 Dia 6 3 Secure Stair Panel To 3 Posts Once the stair panel attach clips have been installed re attach the lower 3 post to th...

Page 13: ...1 16 less than opening size Clean cut areas and apply touch up paint on exposed ends Snap each rail snap over the corresponding rail channel until properly seated Dia 8 34 to 38 from stair nosing to...

Page 14: ...ia 11 4X 8 X 3 4 SELF DRILLING SCREWS 3 POST DETAIL 3 X 3 POST CAP MOUNTING STRUCTURE 4X BASE MOUNTING SCREWS 3 POST BASE RAIL PANEL CLIP DETAIL RAIL PANEL BOTTOM RAIL WALL MOUNT 2X WALL MOUNTING SCRE...

Page 15: ...or building codes The consumer assumes all risks and liability associated with the construction or use of this product The consumer or contractor should take all necessary steps to ensure the safety...