UM-2
1 Warnings and legal notes
The Partly Completed Machinery shown in this manual is to be considered a mere supply of simple Cartesian
axes and their accessories agreed when the contract is stipulated with the client.
The following are therefore to be considered excluded from the contract:
1. Assembly on the client’s premises (direct or final)
2. Commissioning on the client’s premises (direct or final)
3. Testing on the client’s premises (direct or final)
It is therefore understood that the aforementioned operations in points 1.,2., and 3. are not chargeable to Rollon.
Rollon supplies Partly Completed Machinery. The client (direct or final) is responsible for testing and verifying that
the equipment is safe, which by definition cannot be theoretically verified or tested at our premises. The partly
completed machine must not be commissioned until the final machine, in which it is to be incorporated, has been
declared compliant, if necessary, with the instructions in Machinery Directive 2006/42/CE.
This 7th axis is not a “collaborative” equipment.
Warnings and legal notes
Summary of Contents for ROLLON CTU 220-1I
Page 2: ......
Page 44: ...UM 42 Notes Notes...
Page 45: ...UM 43 Cobot Transfer Unit Notes...
Page 46: ...UM 44 Notes Notes...
Page 47: ......