10.1  Rules of operations 

To ensure the Boom Barrier continuous and reliable operation it is necessary:

џ

 to use the product according to its intended purpose;

џ

 all rules specified in this Manual shall be strictly observed during operation;

џ

 to provide maintenance and repair of equipment in due time;

џ

 to prevent the Boom Barrier operation and maintenance to be performed by unauthorized

persons;
                   It is forbidden:

to touch the Boom Barrier arm during its operation;
to prevent Boom Barrier raising/sinking;
to initiate movement of vehicles prior to complete Boom Barrier sinking

10.2 Equipment maintenance:

The Boom Barrier maintenance includes preventive measures to be taken according to the established frequency 
to  maintain  Boom  Barrier  in  operational  condition,  decrease  component  wearing  and  prevent  faults  and 
malfunctions.

10.

 Boom barrier operation regulations 

 

M type

Frequency

Scope of control/work

1

2

3

Daily

inspection

each shift

Daily maintenance is performed before commencement of work and includes: 
- visual inspection of Boom Barrier;
- if required, prompt mechanical troubleshooting, elimination of corrosion and 
surface pollution;
- availability of all units and sensors in their proper locations and their
fastening are reliable;
- performance of all sensors and cable integrity;
- Boom Barrier normal operation without jerks and abnormal noises, jamming of 
movable constructional elements;
- motor heating (over 70°C).

M-1

monthly

M-1 is performed monthly and includes the following measures:
- measures in the scope of daily inspection;
- elimination of dust and dirt from the Boom Barrier housing and components;
- cleaning of actuators, sensors and actuators;
- verification of sensors fixation reliability and their performance;
- verification of good condition and fastening security of cable connections to 
actuators, sensors;
- check of availability and integrity of protective fences and devices.

M-2

semiannually M-2 maintenance is performed semiannually including the following types of work:

- measures in the scope of M-1;
- verification of fastening security of units and devices;
- check of lever tightening; 
- check of spring, circuit and relative anchors; 
- check of barrier arm balance;
- make sure that at the end of stroke the lever is horizontal and / or upright 
position;
- check of operation of  control unit and safety devices;

The equipment examination and maintenance to be performed according to
the Schedule and only by the properly qualified professionals.

Table 8

  -  Boom Barrier maintenance schedule

Page

-22-

 

 

 

 

         

     Size А4

Installation and Operation Manual

Revision 1.0                     2021

ROAD BLOCKING SYSTEMS

 

Office and Production site:               

                                              

Tel.: 

+380 (44) 291-21-11

 14 Promyslova str., 02088, Kyiv, Ukraine,                                     

Fax:

 +380 (44) 291-21-02

 E-mail:

 sales@tiso.global                                                                              www.tiso.global   

                         

  BOOM BARRIER OPTIMUS 

Summary of Contents for Optimus 40

Page 1: ...N MANUAL PART Original guide Page 1 Size 4 Installation and Operation Manual Revision 1 0 2021 ROAD BLOCKING SYSTEMS Office and Production site Tel 380 44 291 21 11 14 Promyslova str 02088 Kyiv Ukrain...

Page 2: ...Recommended Scope of Delivery 5 3 Boom Barrier mechanism design 5 Product speci cation Contents 4 1 Technical features of boom barrier Optimus 4 Technical Specifications 2 Description 1 General Guidel...

Page 3: ...30 EC 2014 35 EC DECLARATION OF CONFORMITY OF EQUIPMENT Page 3 Size 4 Installation and Operation Manual Revision 1 0 2021 ROAD BLOCKING SYSTEMS Office and Production site Tel 380 44 291 21 11 14 Promy...

Page 4: ...2 The product shall be installed in accordance with applicable regulations and rules in compliance with safety precautions during installation work 3 Installation of the equipment shall be carried out...

Page 5: ...ecurity measures The boom barrier must be installed precommissioned and serviced by the certi ed professionals having the relevant quali cation and being familiar with Manuals and product documentatio...

Page 6: ...proaches to cottages and cottage settlements at central urban and historical sites industrial and special facilities 3 1 The electromechanical barrier Optimus is intended to restrict access to territo...

Page 7: ...RAL9005 Arm barrier material powder coated aluminium RAL 9010 LED indicatiion Double sided RYG light indication in cabinet Raised position locking gear motor Manual operation manual release mechanical...

Page 8: ...mm 308 mm View 306 mm 236 mm 350 mm 13 mm 4 holes 60 mm Cable input 22 mm 150 mm 175 mm 42 mm Page 8 Size 4 Installation and Operation Manual Revision 1 0 2021 ROAD BLOCKING SYSTEMS Office and Produc...

Page 9: ...ost 12 Arm lighting RYG After the Boom Barrier is received it is to be unpacked and inspected to be sure that the Boom Barrier is not damaged If any damage is found then the Road Barrier supplier to b...

Page 10: ...spring 4 Electronic control unit 5 Cabinet lid 6 Cabinet light indication 7 Manual operation emergency release 8 Gear motor 9 Gear motor lever 10 11 Upper and lower arm movement restrictor 12 Magnet 1...

Page 11: ...Barrier body by passing vehicles then the required precau tionary measures to be taken if applicable to protect it from impacts The Boom Barrier rack to be securely grounded to ensure electrical safe...

Page 12: ...the foundation by means of anchor bolts The depth of concreting depends on the softness of soil and on the depth of soil freezing 160 500 mm 1 Dig the ground for concrete base prepare the corrugated...

Page 13: ...n the end positions of the barrier open closed the barrier arm must be strictly vertical and horizontal Alignment is achieved by adjusting the positions of the mechanical stops see clause 6 4 3 2 Pres...

Page 14: ...m balance 6 lock the drive by tightening the screw of lever xing 6 4 2 Arm balancing Check the condition for correct arm balancing spring operation in the vertical arm position the spring is in a free...

Page 15: ...of barrier mechanism lever is limited by stops The boom is correctly adjusted when it is suf ciently stable in the 0 and 90 positions For arm lowering or raising adjust the upper and lower position of...

Page 16: ...power must be connected turn off 230V power supply In cases where there is no electricity Optimus boom barrier models have a manual control mode 6 5 Manual control For manual control of the boom barr...

Page 17: ...Versions of Boom barrier Optimus Left version of boom barrier Arm in a horizontal position in an upright position Sector in the top position in the lowered position Spring compressed uncompressed Rig...

Page 18: ...ted to the circuit breaker Neutral N to be connected to terminal 230V Earth to be connected to earthing terminal b Control panel cable to be connected to terminals P Power control panel power supply 1...

Page 19: ...outside the arm of boom barrier two posts are installed on opposite sides of roadway a transmitter is mounted on one post a sensor receiver is on the other Place the receiver and transmitter of the sa...

Page 20: ...sition until new commands are given Forbidden boom barrier partially closed Close the passage Press the button DOWN The boom barrier will rise to the lowest position and stop Forbidden boom barrier cl...

Page 21: ...s are faulty Check safety sensors replace them if necessary In case of a malfunction which cannot be solved using the information from this Manual contact the service department 9 2 Possible malfuncti...

Page 22: ...le integrity Boom Barrier normal operation without jerks and abnormal noises jamming of movable constructional elements motor heating over 70 C M 1 monthly M 1 is performed monthly and includes the fo...

Page 23: ...which on the boom barrier connection line must be installed 10 3 6 Boom barrier electrical equipment should be earthed Resistance between earthing bus and each accessible metal non current carrying pa...

Page 24: ...o prevent boom barrier raising and sinking to use metalwork of boom barrier for connection of neutral wire of electric welder to perform welding works near the road blocker without noncombustible mate...

Reviews:

Related manuals for Optimus 40