background image

1.

General safety provisions

џ

It is forbidden to make changes to the arrangement of equipment and use of materials and 
components  that  are  not  included  in  scope  of  delivery  and  are  not  provided  for  in  this 
Manual.

џ

Safety devices shall protect potentially hazardous areas.

џ

In  the  case  of  violation  of  the  operating  rules  and  the  requirements  of  the  operational 
documentation, the boom barrier may pose no hazard to life and health by virtue of high 
voltage and moving parts of the product! 

џ

Personnel involved in maintenance of existing electrical installations or commissioning, 
electrical installation, repair work, maintenance and installation shall be trained to work 
with this model of the device! Training shall be carried out at the manufacturer's represen-
tatives' or at the manufacturers' of the product. 

џ

Do not allow children and unauthorized persons to stay near operating equipment. The manufacturer shall bear 

no responsibility for violation of safety rules.

The Manual should be scrutinized prior to the equipment installation and operation to ensure 
the human safety. Safety is not ensured in case of improper operation or use.

џ

TiSO Company ensures its best effort for guarantee and correctness of this Manual and reflecting material 
changes  in  the  design.  However,  a  policy  of  continuous  improvement  can  lead  to  insignificant  differences 
between the equipment supplied and the description in this document.

џ

Any actions that are not explicitly listed in these instructions shall be prohibited.

џ

The Manual to be kept for future use. 

џ

Transportation of the product shall be ensured only with the barrier arm removed!

1.1

 

Instructions for installers:

1. For your safety, follow the installation instructions;
2.The product shall be installed in accordance with applicable regulations and rules, in compliance with safety 

precautions during installation work;

3. Installation of the equipment shall be carried out with the power supply disconnected;
4. Packaging materials shall be disposed in accordance with applicable standards;
5. Strictly observe the sequence of operations for assembling the boom barrier specified in the instruction;

9.   Appropriate warning signs, operating in the territory of the country, shall be placed on the section of traffic 

regulated by boom barrier!

џ

Do not install this equipment during a lightning storm, heavy rain or snow, in an explosive 
atmosphere  and  in  poor  visibility.  Mounting  zone  is  equipped  according  to  the  current 
standards.

џ

Boom  barrier  installation,  connection  and  commissioning  works  shall  be  performed  by 
specialists of the appropriate qualification.

 
6. If  faults or defects are detected, contact the supplier's service service.
 7. The installer shall provide the user with the necessary information on the operation of the system in manual mode 

in case of an emergency.

8. Before handing over the product to the end user, check consistency of product indicators. Make sure that the 

automation, security and unlocking of drive configured correctly.

   
 

The manufacturer is not responsible for the operation of equipment in the following cases:

џ

non-compliance with the installation technology,

џ

use of non-standard materials and components,

џ

performance of work by unqualified personnel,

џ

manufacturer  is  not  responsible  for  the  safety  measures  when  installing  the  equipment  by  personnel  not 
involved in the company service department.

Page

-4-

 

 

 

 

         

     Size А4

Installation and Operation Manual

Revision 1.0                     2021

ROAD BLOCKING SYSTEMS

 

Office and Production site:               

                                              

Tel.: 

+380 (44) 291-21-11

 14 Promyslova str., 02088, Kyiv, Ukraine,                                     

Fax:

 +380 (44) 291-21-02

 E-mail:

 sales@tiso.global                                                                              www.tiso.global   

                         

  BOOM BARRIER OPTIMUS 

Summary of Contents for Optimus 40

Page 1: ...N MANUAL PART Original guide Page 1 Size 4 Installation and Operation Manual Revision 1 0 2021 ROAD BLOCKING SYSTEMS Office and Production site Tel 380 44 291 21 11 14 Promyslova str 02088 Kyiv Ukrain...

Page 2: ...Recommended Scope of Delivery 5 3 Boom Barrier mechanism design 5 Product speci cation Contents 4 1 Technical features of boom barrier Optimus 4 Technical Specifications 2 Description 1 General Guidel...

Page 3: ...30 EC 2014 35 EC DECLARATION OF CONFORMITY OF EQUIPMENT Page 3 Size 4 Installation and Operation Manual Revision 1 0 2021 ROAD BLOCKING SYSTEMS Office and Production site Tel 380 44 291 21 11 14 Promy...

Page 4: ...2 The product shall be installed in accordance with applicable regulations and rules in compliance with safety precautions during installation work 3 Installation of the equipment shall be carried out...

Page 5: ...ecurity measures The boom barrier must be installed precommissioned and serviced by the certi ed professionals having the relevant quali cation and being familiar with Manuals and product documentatio...

Page 6: ...proaches to cottages and cottage settlements at central urban and historical sites industrial and special facilities 3 1 The electromechanical barrier Optimus is intended to restrict access to territo...

Page 7: ...RAL9005 Arm barrier material powder coated aluminium RAL 9010 LED indicatiion Double sided RYG light indication in cabinet Raised position locking gear motor Manual operation manual release mechanical...

Page 8: ...mm 308 mm View 306 mm 236 mm 350 mm 13 mm 4 holes 60 mm Cable input 22 mm 150 mm 175 mm 42 mm Page 8 Size 4 Installation and Operation Manual Revision 1 0 2021 ROAD BLOCKING SYSTEMS Office and Produc...

Page 9: ...ost 12 Arm lighting RYG After the Boom Barrier is received it is to be unpacked and inspected to be sure that the Boom Barrier is not damaged If any damage is found then the Road Barrier supplier to b...

Page 10: ...spring 4 Electronic control unit 5 Cabinet lid 6 Cabinet light indication 7 Manual operation emergency release 8 Gear motor 9 Gear motor lever 10 11 Upper and lower arm movement restrictor 12 Magnet 1...

Page 11: ...Barrier body by passing vehicles then the required precau tionary measures to be taken if applicable to protect it from impacts The Boom Barrier rack to be securely grounded to ensure electrical safe...

Page 12: ...the foundation by means of anchor bolts The depth of concreting depends on the softness of soil and on the depth of soil freezing 160 500 mm 1 Dig the ground for concrete base prepare the corrugated...

Page 13: ...n the end positions of the barrier open closed the barrier arm must be strictly vertical and horizontal Alignment is achieved by adjusting the positions of the mechanical stops see clause 6 4 3 2 Pres...

Page 14: ...m balance 6 lock the drive by tightening the screw of lever xing 6 4 2 Arm balancing Check the condition for correct arm balancing spring operation in the vertical arm position the spring is in a free...

Page 15: ...of barrier mechanism lever is limited by stops The boom is correctly adjusted when it is suf ciently stable in the 0 and 90 positions For arm lowering or raising adjust the upper and lower position of...

Page 16: ...power must be connected turn off 230V power supply In cases where there is no electricity Optimus boom barrier models have a manual control mode 6 5 Manual control For manual control of the boom barr...

Page 17: ...Versions of Boom barrier Optimus Left version of boom barrier Arm in a horizontal position in an upright position Sector in the top position in the lowered position Spring compressed uncompressed Rig...

Page 18: ...ted to the circuit breaker Neutral N to be connected to terminal 230V Earth to be connected to earthing terminal b Control panel cable to be connected to terminals P Power control panel power supply 1...

Page 19: ...outside the arm of boom barrier two posts are installed on opposite sides of roadway a transmitter is mounted on one post a sensor receiver is on the other Place the receiver and transmitter of the sa...

Page 20: ...sition until new commands are given Forbidden boom barrier partially closed Close the passage Press the button DOWN The boom barrier will rise to the lowest position and stop Forbidden boom barrier cl...

Page 21: ...s are faulty Check safety sensors replace them if necessary In case of a malfunction which cannot be solved using the information from this Manual contact the service department 9 2 Possible malfuncti...

Page 22: ...le integrity Boom Barrier normal operation without jerks and abnormal noises jamming of movable constructional elements motor heating over 70 C M 1 monthly M 1 is performed monthly and includes the fo...

Page 23: ...which on the boom barrier connection line must be installed 10 3 6 Boom barrier electrical equipment should be earthed Resistance between earthing bus and each accessible metal non current carrying pa...

Page 24: ...o prevent boom barrier raising and sinking to use metalwork of boom barrier for connection of neutral wire of electric welder to perform welding works near the road blocker without noncombustible mate...

Reviews: