TPM 053
Version 1.0, May 30, 2017
Page | 14
MODULE INSTALLATION
Gateway Installation and Operation Manual
Pre-installation Checklist
Checked
Steps
1. Equipment Verified
•
Required tools and equipment
•
Optional tools and equipment
•
Parts and material provided by Titan
•
Parts and material not provided by Titan
2. Facility Requirements Verified
3. TD80 System Operation Confirmed
•
Retrofit Installation
•
New Installation
Mechanical Installation Checklist
Checked
Steps
1.
Mounting Location Chosen
2.
Mounting Bracket and Module Installed
3.
Junction Box Installed
4.
Air Pressure Switch Installed (Trailer)
5.
Visual Inspection Performed
Electrical Installation Checklist
Checked
Steps
1.
Power Supply Verified
2.
Gateway to Junction Box Connected
3.
Finch Display to the Junction Box Connected
4.
Air Pressure Switch to Junction Box Connected (Trailer)
5.
Electrical Power to Junction Box Connected
6.
Visual Inspection Performed
Confirmation Checklist
Checked
Steps
1.
Operation of the Gateway Confirmed