INSTALLATION OF THE PROTECTIVE
GUARD
- Unplug the tile cutter from the mains supply.
- Place the guard onto the metal bracket (Fig 13)
and fix in place using the screw and washer. Push
the black cover cap over the nut (Fig 14).
- Cover the diamond disc with the guard.
- Ensure that protective guard can move freely
and that it cannot touch the disc.
- Do not over tighten the protective guard when
fixing it. The guard should be free to rise and fall
as the workpiece is pushed towards the disc.
INSTALLATION OF THE PARALLEL GUIDE
- Unplug the tile cutter from the mains supply.
- Put the parallel guide onto the working table
and fix it using the plastic securing knobs
(Fig 15).
- Mitre cutting can be performed by using the
mitre cutting guide. The angle can be adjusted
from 0° to 45° by unscrewing the black plastic
screw.
- To perform 45° bevel cut, raise one side of the
table, lever out the support and locate the labs
into the corresponding holes in the deck (Fig 16).
Ensure that the deck is correctly secured before
working.
Fig 13
Fig 14
Fig 15
Fig 16