12
The Unit must be mounted plumb and level front to back and side to side.
1. Mark a horizontal line on the wall
using a spirit level. This line will be
approximately 95mm below the
location of the top face of the unit
when fitted (excluding duct ports).
2. Use one of the Mounting Brackets
as a template to mark the three
fixing hole centres.
3. Drill holes for fixings, always use a
fixing suited to the wall type.
4. Fix one Mounting Bracket to the
wall ensuring the interlocking side
is at the top, as shown.
Mounting Bracket highlighted
Summary of Contents for auralite TP518
Page 21: ...21 Wiring Diagrams ...
Page 22: ...22 Notes ...
Page 30: ...30 Service Record Serviced By Company Date Notes ...