14
10.
MAINTENANCE SCHEDULE
1.
Check all hardware after the first 5 hours of use, the follow the maintenance schedule.
Maintenance
Services
Intervals
After
every use
After 45
days or
50 hrs.
Every 3
months
or
100 hrs.
Every 6
months
or
200 hrs.
Every 9
months
or
300 hrs.
Every 12
months
or
400 hrs.
General Inspection:
Guards
Check
X
X
X
X
X
Warning stickers
Check
X
X
X
X
X
Test run
Check operation
X
X
X
X
X
V-belt & Clutch
Check
X
X
X
Engine:
Engine oil
Check level
X
X
X
X
X
X
Change
X
X
X
Engine oil filter
Replace
X
X
Oil cooler
Clean
X
X
X
X
Cooling Fins
Clean
X
X
X
X
X
Air cleaner
Check - clean
X
X
X
X
X
X
Replace
X
Air Intake Line
Check
X
Replace
2 years
Fan Belt
Check tightness
X
X
Replace
500 hrs.
Valve clearance
Check-adjust
X
X
Fuel filter
Check & clean
X
X
X
X
Replace
X
X
Fuel Tank
Clean
500 hrs.
Engine wiring
Check
X
11. REPLACEMENTS
Parts
Tolerance or Replacement Cycle
Engine Components
Refer to your engine manufacturer´s Owner´s
Manual
V-Belts
Replace if stretched to the point that the idler does
not work properly. Replace the V-belts if they are
cracked or torn.
Hardware
Re-torque all bolts after the first eight hours of
operation and check hardware every 25 hours.
Replace any worn or damaged hardware as
needed. Replacement hardware should be grade 5
and zinc plated.
Safety Decals
Replace if they become aged, damaged or cannot
be easily read.
Discount-Equipment.com