This device and every other certified Z-Wave device can be
used together with any other certified Z-
Wave device regardless of brand and origin
as long as both are suited for the same frequency
range.
If a device supports
secure communication
it will communicate with other devices secure as long as
this device provides the same or a higher level of security. Otherwise it will automatically turn into a
lower level of security to maintain backward compatibility.
For more information about Z-Wave technology, devices, white papers etc. please refer to
www.z-
wave.info
.
Product Description
This smart energy plug is able to detect current wattage (5-3000W) and overload wattage (3010-3300W) of connected lights or appliances. When detecting
overload state, the switch will be disabled and its on/off button will be lockout of which LED will flash quickly. However, unplug and re-connect the switch
and it will reset its overload condition to normal status.
Prepare for Installation / Reset
Please read the user manual before installing the product.
In order to include (add) a Z-Wave device to a network it
must be in factory default state.
Please make sure to reset the device into factory default. You
can do this by performing an Exclusion operation as described below in the manual. Every Z-Wave controller is able to perform this operation however it is
recommended to use the primary controller of the previous network to make sure the very device is excluded properly from this network.
Reset to factory default
This device also allows to be reset without any involvement of a Z-Wave controller. This procedure should only be used when the primary controller is
inoperable.
1. To reset, press the socket on/off button three times within 1.5 seconds
2. then the fourth time, press and hold for seconds until the socket LED is off
3. the socket reset successfully Use the "Reset" procedure only in the event that the network primary controller is missing or otherwise inoperable
Safety Warning for Mains Powered Devices
ATTENTION: only authorized technicians under consideration of the country-specific installation guidelines/norms may do works with mains power. Prior to
the assembly of the product, the voltage network has to be switched off and ensured against re-switching.
Installation
Plug this On/OFF Switch into a wall outlett.
Create PDF in your applications with the Pdfcrowd
HTML to PDF API
PDFCROWD