8
STEP 6
Connect the
Lower Pulse Sensor Wire (113)
and the
Middle Pulse Sensor Wire
(112B).
Install the
Handlebar (6)
to the
Upright Post (5)
, secure it using 4
Lock Washers
(M8)(78)
and 4
Bolts, Button Head (M8xp1.25x16mm)(90)
. Tighten it securely with
wrench.
STEP 7
Loosen the
Screw (M3x10mm)(79)
then open the
Battery cover. Install
4 AA
rechargeable batteries (included)
(Please only use the Nickel-Metal Hybrid/NI-MH
rechargeable battery).
STEP 8
Re-Attach the
Battery Cover (16)
back of the
Display Console (13)
and the
Screw
(M3x10mm)(79).
STEP 9
Connect the
Middle Pulse Sensor Wire (112A)
to the
Middle Pulse Sensor Wire (112)
then connect the
Middle Connection Wire (109A)
to the
Middle Connection Wire
(109)
.
STEP 10
Install the
Display Console (13)
to the
Metal Bracket on the Upright Post (5)
, secure it
with 4
Screws, Round Head (M5xp0.8x15mm)(83)
using a Philip screw driver.
STEP 11
Attach the
Console Lower Case (15)
to the
Display Console (13)
and secure it with 1
Screw, Round Head (M5xp0.8x15mm)(83)
using a Philip screwdriver.
Summary of Contents for 9GU
Page 1: ...ASSEMBLY MANUAL 9GU COMMERCIAL UPRIGHT BIKE...
Page 2: ......
Page 4: ...3...
Page 17: ...EXPLODED DRAWING...
Page 18: ...17...
Page 19: ...18...