4.3.8
4.3.9
4.3.10
4.3 Riveting tool operation
The results should be checked after the
riveting operation. If the installed rivet
does not meet quality requirements,
the reason for the fault must be deter-
mined.
If the quality of the installed rivet is ac-
ceptable, the work process can be re-
peated.
After each riveting operation, check that the rivet man-
drel and rivet die are firmly seated. If they have loos-
ened, tighten them with the spanner that came with
the equipment.
Summary of Contents for PNP 90 SNW-RIV
Page 31: ...31...