Pilot Operating Handbook
Section 10
TL-2000
Sting
Supplementary Information
Notice! The information contained in this document is for reference and information only.
The pilot is the final and only responsible party for the safe operation of this aircraft.
31 December 09 / Chg 5
10-16
Copyright © 2009 Reproduction of this document or any of its parts is forbidden.
NORMAL PROCEDURES
PREFLIGHT INSPECTION
COCKPIT
1.
All Switches -- OFF
2.
Fuel Valve -- OPEN
3.
Main Switch -- ON
4.
Fuel Gauge -- CHECK QUANTITY
5.
ELT Control Panel Indicator -- CHECK STATUS
6.
Main Switch -- OFF
7.
Flight Controls -- PROPER OPERATION
8.
Flaps -- PROPER OPERATION, SET FULL
9.
Trim -- CENTERED
10.
Required Documentation -- ON BOARD
11.
Baggage -- SECURED
12.
Seats -- SECURE
13.
Proceed to Exterior Checklist
EXTERIOR CHECKLIST
NOSE AREA
1.
Windshield -- CLEAN
2.
Cowling -- SECURE, screws tight
3.
Prop/Spinner -- CHECK
4.
Air Inlets -- CLEAR
5.
Oil -- CHECK QUANTITY
6.
Coolant – CHECK QUANTITY
7.
Nose Strut Assembly -- CHECK
8.
Nose Tire -- CHECK INFLATION and WEAR
9.
Chock -- REMOVE
10.
Firewall Fuel Gascolator – CHECK for debris
11.
Fuel and Oil Tank Vents -- CLEAR
12.
Traffic Alert Antennae -- Secure
13.
Transponder Antennae -- Secure
14.
Fuselage Fuel Sump -- DRAIN, Check for water and contaminates