STEP 10
(Power Unit Installation)
1.
Mount the Power Unit to the Mounting Bracket
using the M8 Hex Head Bolts and Nylock Nuts then fill
the reservoir with 12 quarts of 10-WT hydraulic oil or
Dexron III automatic transmission fluid. (See Fig. 10.1)
4.
Tighten each Nut until there is at least 2-3threads
protruding through the top of the nut. The Cables will
remain loose until start up and final Cable
adjustments are made. (See Fig. 9.4)
Fig 9.4
5.
After routing the Cables double-check to make sure
all are properly positioned and remain within thegrooves
of ALL Sheaves. (See Fig. 9.5 - 9.6)
Fig 9.6
ALL WIRING MUST BE PERFORMED
BY A LICENSED ELECTRICIAN.
Fig 10.1
M8 Hex
Bolts
Flat
Washers
M8 Nylock
Nuts
Fig 9.5
Fig 9.3
DO NOT PERFORM ANY MAINTENANCE OR
INSTALLATION OF ANY COMPONENTS
WITHOUT FIRST ENSURING THAT ELECTRICAL
POWER HAS BEEN DISCONNECTED AT
THE SOURCE OR PANEL AND CANNOT BE
RE-ENERGIZED UNTIL ALL MAINTENANCE
AND/OR INSTALLATION
PROCEDURES ARE COMPLETED.