W W W . T M G I N D U S T R I A L . C O M P 1 5 / 1 5 T o l l F r e e : 1 - 8 7 7 - 7 6 1 - 2 8 1 9
Install the eight clip spring (# 18) and fasten the braided rope (# 29).
Figure 12
No.
Part
Qty
No.
Part
Qty
13
2
24
2
16
2
28
4
18
78
29
1
After the Installation
Walk around and inspect the shelter periodically to make sure all components are
still firmly secured and the whole shelter is well supported. Check all bolts and nuts
as well as all connection points to make sure they are all in good position.
We strongly recommend you remove any snow from the roof immediately. Do not
leave any snow load on the roof overnight. Keep 3 feet of clearance on all sides at
all times. Do not allow snow to accumulate and pile up on the sides of the building.
Otherwise the pressure from the sides will push inwards and could lead to a
collapse
.