www.tmgindustrial.com
21/35
Toll Free:1-877-761-2819
OPERATING FINISH
1. Seiri and check after operating
(1) Should organize and clean the rotary machine after the operation of rotary machines, remove the grass
clippings, dirt during the job.
(2) After using a rotary tiller should be careful to check some of the parts can be damaged, if parts need to
be replaced, should also pay attention to cut off all the power, turn off the tractor firstly.
(3) For the most easily damaged parts must be carefully checked immediately so as not to affect the next
use. Particular pay attention to the blades, generally three methods of replacement: outward, inward turn,
a mixed installation, to respond to different working environment, pay attention to distinguish; adjust
blades and note blade axle speed
2. Separate from the tractor
(1) The PTO drive shaft ends will be removed from the tractor and rotary tiller end.
(2) Set flat rotary tiller, separate the tractor suspension with 3-point hitch from rotary tiller.
3. Storage
When machine will be placed for a long time, make sure to inspect parts , add oil , and make dust-proof
work.
MAINTENANCE SCHEDULE
Inspection unit list
Inspection time
Blade
Before/in/post the job
Cutter
Before/Post the job
Greasing
59 hours/times
Bolts or nuts loose
1 hour in the new use
Gear oil
50hours in the new use, and per 300hours or seasonal
conduct after changing oil
Summary of Contents for TMG-RT83
Page 24: ...www tmgindustrial com 24 35 Toll Free 1 877 761 2819 2 Hood assembly ...
Page 26: ...www tmgindustrial com 26 35 Toll Free 1 877 761 2819 ...
Page 27: ...www tmgindustrial com 27 35 Toll Free 1 877 761 2819 4 Left Panel Assembly ...
Page 29: ...www tmgindustrial com 29 35 Toll Free 1 877 761 2819 ...
Page 31: ...www tmgindustrial com 31 35 Toll Free 1 877 761 2819 7 Gearbox assembly ...
Page 33: ...www tmgindustrial com 33 35 Toll Free 1 877 761 2819 ...
Page 34: ...www tmgindustrial com 34 35 Toll Free 1 877 761 2819 9 Side gearbox housing assembly ...