SECTION 2 - INSTALLATION
11
F. Initially Clean the Griddle
1.
Clean the rust preventive material from the griddle surface with a non-flammable grease solvent.
2.
Wash the griddle with warm water and a mild detergent.
3.
Rinse with a damp cloth and wipe dry.
G. Test the Installation, refer to Figure 3-2
NOTE: The griddle must be initially cleaned as directed in Step F before completion of Step G.
1.
Turn all rocker On/Off switches to the "Off" position.
2.
Turn all thermostat control knobs to the lowest temperature setting.
3.
Turn the main power disconnect switch to "ON".
4.
Turn "On" the On/Off switch located at the left end of the griddle. Then turn the corresponding left thermostat control
knob to 200°F (93°C) and check that heating light located below control knob illuminates. Wait a few minutes and check
to see if the left section of the griddle has heated. Then wait a few more minutes and check that the heating light goes
off when the section of the griddle reaches set temperature. Turn the temperature control knob back to its lowest
position and turn the On/Off Switch back to "Off".
5.
Move to the next rocker On/Off switch and thermostat control knob and repeat Step 4. Continue until the entire
griddle has been tested.
Summary of Contents for ACCU-MISER AM24
Page 6: ...SECTION 1 DESCRIPTION 2 Component Location Figure 1 2...
Page 9: ...SECTION 1 DESCRIPTION 5 Griddle Dimension Drawing...
Page 10: ...SECTION 1 DESCRIPTION 6 NOTES...
Page 16: ...SECTION 2 INSTALLATION 12 NOTES...
Page 23: ...SECTION 4 PARTS LIST 19 SECTION 4 PARTS LIST...
Page 24: ...SECTION 4 PARTS LIST 20 Figure 4 1 Overall Exploded Drawing...
Page 26: ...SECTION 4 PARTS LIST 22 NOTES...
Page 27: ...SECTION 5 SCHEMATICS 23 SECTION 5 SCHEMATICS...
Page 28: ...SECTION 5 SCHEMATICS 24...
Page 29: ...SECTION 5 SCHEMATICS 25...
Page 30: ...SECTION 5 SCHEMATICS 26...
Page 31: ...SECTION 5 SCHEMATICS 27...
Page 32: ...SECTION 5 SCHEMATICS 28...
Page 33: ...SECTION 5 SCHEMATICS 29...