6
1.4 How it works
•
Monitoring LED
The LED lights up either GREEN or RED depending on the operation:
GREEN light indicates the completion of successful reading 2D symbols.
Flashing GREEN light indicates the image data transmission in progress.
RED light indicates a decoding failure.
•
Triggering Switch
This switch is used to initiate the read and decode of the 2D symbols.
•
Image Capture Switch
This switch is used when taking picture images such as signatures, or inked
stamp images, facial pictures, etc.
•
Connecting Cable
When connecting with PCs or host computers, a cable with D-sub 9P connector
should be utilized.
For supplying the power to the unit, the AC adapter power plug should be plugged
into its mating receptacle on the connector housing next to the D-sub 9P
connector.