14
It is important that the liner is properly centered, taut and with as few folds as possible. To
remove folds from the liner on the base of the pool, take off your shoes and smooth the liner out
towards the sides with your feet. Check that the water is evenly distributed, without forming pools
which indicate that the ground underneath has dips. If the water is higher at one side, this means
that the ground is not level. If this occurs, you must empty the pool, disassemble all the components
and start the assembly over after levelling the ground. It is extremely important that the pool is
perfectly level.
13. INSTALLATION OF THE UPPER PROTECTIVE SECTION (PL)
a) Remove the pegs as you install the protective section (PL) on top of the liner and around the
perimeter of the pool, photos 48 and 49. Leave +/- 5 cm of liner on the outside of the strip, avoid
wrinkles, do not pull tight.
b) Mark and cut off the protector surplus, photos 50 and 51.
14. INSTALLATION OF THE UPPER SECTION (PBS)
(PBS are shown in pictures as PCS)
Important: If your pool has included the decorated band, place it as per the decoration’s manual,
before installing the upper profiles PBS.
a) Position the upper section (PBS) on top of the protective section (PL) around the entire pool
perimeter, photo 52.
b) Mark and cut off the protector surplus, photos 53 and 54. To prevent the pool wall from falling
inwards, place the upper plate (5) on the central columns (1), photo 55.
15. ASSEMBLY OF THE VERTICAL SECTIONS (VER)
Distribute the vertical sections around the pool and place plate T2 onto the upper part of the pool,
centre photo.
a.
Align the lower part of one of the vertical sections (VER) with the two small tabs on the base
plates (T1). The tabs must be on the inside of the vertical section.
b. Align the openings for positioning screws TO2, on either side of
the vertical section, making sure that they attach to the holes in
the T1 plate tabs, photos 56 and 57.
c.
Place an upper section (T2) onto the top edge of the pool
and on a vertical column (VER), with the tabs on the inside of the
section, photo 58.
d.
Align the openings for positioning screws TO2 in the three
holes in the vertical section, making sure they fit into the T2 tab
holes, photo 59.
e.
Repeat steps a, b, c, d in the other sections around the pool.
photo 52
photo 53
photo 54
photo 55
photo 48
photo 49
photo 50
photo 51