TABLE OF CONTENTS
1.0
INTRODUCTION
3
1.1
SYSTEM SPECIFICATIONS
3
2.0
SYSTEM ITEM IDENTIFICATION (See Figure 1)
4
2.1
SYSTEM ITEM DESCRIPTIONS
6
2.2
SYSTEM OPTION DESCRIPTIONS
7
2.3
RO SUPPORT EQUIPMENT
8
3.0
PRE-INSTALLATION PROCEDURES
8
3.1
PACKAGING
8
3.2
RO SYSTEM OPERATION
8
3.2.1
FEED WATER CONSIDERATIONS
8
3.2.2
OPERATING PARAMETER SETTINGS
8
3.2.3
OPERATING PARAMETER CONDITIONS
9
3.3
PRE-TREATMENT
9
4.0
INSTALLATION
9
4.1
LOCATION
9
4.2
PLUMBING (See Figure 2)
10
4.2.1
WATER SUPPLY CONNECTION
10
4.2.2
DRAIN CONNECTION
10
4.2.3
PRODUCT CONNECTION
10
4.3
ELECTRICAL (See Figure 3)
10
4.3.1
EXTERNAL FLOAT SWITCH WIRING
13
4.3.2
EXTERNAL PRESSURE TANK SWITCH WIRING
13
4.3.3
PRE-TREAT LOCKOUT SWITCH WIRING
13
5.0
STARTUP, FLUSH AND PERFORMANCE VERIFICATION
14
5.1
PUMP ROTATION DIRECTION
14
5.2
INITIAL START AND FLUSHING
14
5.3
PERFORMANCE VERIFICATION
14
5.3.1
FLOW TESTS
15
5.3.2
RECOVERY
15
5.3.3
REJECTION
15
5.3.4
LOW PRESSURE SWITCH TEST
15
5.3.5
OPTIONAL TANK PRESSURE SWITCH TEST
15
5.3.7
OPTIONAL BLENDING SYSTEM
15
5.3.8
OPTIONAL AUTO FLUSH SYSTEM
16
6.0
MAINTENANCE
16
6.1
DAILY SYSTEM CHECKS
16
6.2
MONTHLY SYSTEM CHECKS
16
6.3
SEMI-ANNUAL SERVICE
16
6.4
PERIPHERAL EQUIPMENT
16
7.0
SERVICE
16
7.1
LOW PRESSURE SWITCH ADJUSTMENT
16
7.2
TANK PRESSURE SWITCH ADJUSTMENT
17
7.3
MEMBRANE REPLACEMENT (See Figures 4 and 5)
17
7.4
SEDIMENT FILTER CARTRIDGE REPLACEMENT
20
8.0
PLANT SHUTDOWN
21
1
Summary of Contents for TV-6000
Page 2: ...TOMAR TV 6000 SYSTEM ...
Page 7: ...Figure 1 Typical System Configuration TV 12K shown 5 ...
Page 13: ...Figure 2 System Plumbing Diagram 11 ...
Page 14: ...Figure 3 System Electrical Schematic Diagram ...
Page 20: ...Figure 4 PVC Vessel Membrane Assembly 18 ...
Page 21: ...Figure 5 Stainless Steel Vessel Membrane Assembly 19 ...
Page 28: ...25 NOTES ...
Page 31: ......