TOMARK, s.r.o.
Airplane Maintenance Manual
Chapter32 Landing Gear
Page 126
Issue: 11.AUG 2016
Item Description
Item Description
1 Shock cord ring
6 Tensioning tool
2 Steel cable deflection limiter
7 Mounting cup
3 Attaching bolt
8 Centering block
4 Mounting rod
9 Nose gear strut
5 Nose gear attaching bracket
▶
Remove air hoses from heating system for easier access to the nose
gear attaching bracket (5).
▶
Jack the aircraft front as per Chapter
▶
Remove the nose wheel fork with wheel as per Chapter
▶
Place the mounting rod (4) to the nose gear attachment bracket.
▶
Put the mounting cup (7) over the nose gear strut (9) and connect it
with the mounting rod using the two tensioning tools (6).
▶
Tension the two tensioning tools simultaneously 5 mm to be able to
remove the centering blocks (8).
▶
Remove the centering blocks (2 bolts each).
▶
Release the two tensioning tools simultaneously until centering rolls
are on the nose gear attachment bracket.
▶
Note position of cords and remove the bolt attaching (3) the shock
cord rings (1) and the steel cable deflection limiter (2).
▶
Turn the nose gear strut to the right side and change the left shock
cord ring,
▶
Turn the nose gear strut to the left side and change the right shock
cord ring.
▶
Install the shock cord rings and the steel cable deflection limiter to
the positions as noted before using the attaching bolt.
▶
Tension the two tensioning tools simultaneously ~10 mm to be able
to install the centering blocks.
▶
Reinstall the centering blocks (2 bolts each).
▶
Completely release the two tensioning tools simultaneously.
▶
Remove the tools.
▶
Reinstall the nose gear fork with wheel.
▶
Reinstall the nose wheel fairing and nose gear strut fairing.
▶
Reinstall heating system air hoses.
▶
Remove the jack.