TOMARK, s.r.o.
Airplane Maintenance Manual
Chapter 05 Inspection and Maintenance
Issue: 04.APR 2016
Page 41
Scheduled Inspection
(50 h)
100 h/
annual
as
specified
Horizontal stabilizer
Demount the fuselage tail fairing. Reinstall the fairing only
after the completion of the inspection.
○
○
Visually check the fuselage tail fairing for cracks and other
damage. Repair or replace, if necessary.
○
○
Visually check the horizontal stabiliser. The skin and the
riveting. Deformations, cracks, scratches or loosened rivets
are not allowed.
○
○
Check the condition of the hinges of the horizontal stabiliser.
The torque of the connecting bolts and their locking.
○
○
Check the condition and attachment of the stabilizer tip
fairing.
○
Check the attachment of the horizontal stabiliser by moving
the stabiliser forward and backward, up and down.
○
Check the attachment elements of the stabiliser, the torque
and locking of the bolts.
○
Elevator
Visually check the condition, skin and riveting of the elevator.
Deformations, cracks, scratches and loosened rivets are not
allowed. Pay specific attention to weld seams and rivet
connections on the elevator torsion tube bracket.
○
○
Check the elevator for free movement.
○
○
Visually check the hinge of the elevator for corrosion, cracks,
bolt locking and control connections.
○
○
Check the attachment of the elevator trim tab for play and
other damage.
○
Remove the inspection hatch and check the attachment of the
servo and the locking of the pitch trim tab pull-push rod.
○
Check the electric wiring of the trim control for damage.
○