TOMARK, s.r.o.
Airplane Maintenance Manual
Chapter 05 Inspection and Maintenance
Page 48
Issue: 04.APR 2016
Scheduled Inspection
(50 h)
100 h/
annual
as
specified
Check navigation and strobe light for condition and proper
installation.
○
Emergency
Revise the Aircraft Emergency Parachute System.
○
1
Placards (refer to pilot’s operating handbook)
Placards and Decals: Check presence, legibility and security.
Consult AFM for required placards exterior and interior.
○
Finish
Inspect all aircraft compartments for foreign objects, tools
etc.
○
○
○
2
Reinstall (as applicable):
Aerodynamic fairings
Note: If specific work involved opening/closing of oil, coolant
or fuel system related hose connections, it is advised to
execute a short ground run without cowling to check for
leaks.
○
○
○
2
Check seat belt routing
○
○
○
2
Check control system operation.
○
○
○
2
Reattach ignition leads to spark plugs if removed. Reattach air
box hose if bottom cowling was removed.
○
○
○
2
Ground Run
Perform engine ground run (without upper cowling) according
to ROTAX 912 Line Maintenance and Operators Manuals.
Observe the following when performing an engine test run:
○
○
○
2
Check general conditions and power plant start behaviour
○
○
○
2
Check pressures, temperatures, acceleration performance
○
○
○
2
1
At latest after 6 years
2
First 25 hours of operation for new or overhauled engine