TH2689/89A Operation manual
28
(
3
)(
CHG TIME
),
default is Vm=Vs
Figure 3-31
Move cursor to “CHG TIME”
:
Calculate the charge time fron Vm=Vs
Calculate the charge time from Vm=0V
※
According to JIS
(
Japanese Industrial Standards
,
),
after the DUT is charged to
the rated working voltage
,
calculate the charge time, so please select Vm=Vs in
order to meet the rules of JIS.
(
4
)
Switch range interval time
(
RNG DWELL
),
range 0.0Sec
~
9.9Sec
,
default
is 0.0Sec
Figure 3-32
Move cursor to “RNG DWELL”
:
+0.1Sec
-0.1Sec
Numeric key
Input switch range interval time directly, default unit is
Sec
(
5
)
Test average time
(
AVERAGE
),
range 1
~
8
,
default is 1
。