background image

 

tighten.  In  upper  outer  side,  using  Bolt  M10X165  (A6)  that  was  assembled  on  frame  to 
tighten.(Attention: bolt head position is the front underside. See figure 3-1)

 

 

 
 

4. Assembling handlebar and controller 

A. Connect  the  Signal  wire  from  Right 
upright  tube  to  corresponding  wires  from 
Handlebar. 
B. Install  handlebar  and  controller  set(6)  to 
the Left/Right upright tube (4,5). 
C. Connect  handlebar  and  controller(6)  to 
the Left/Right upright tube (4,5) using 8 sets 
of  Half-round  bolt  M10X20(A8),Spring 
washer

φ

10(C5),Flat  washer

φ

10(C2). 

(Attention: To align screw hole)(See figure 4)

 

 

 
 
 
 
 

5. Assembling display screen

 

A.  Connect  the  signal  wire  from  display 
screen  to  corresponding  wire  from 
controller.  Crowding  the  extra  wire  into 
controller. 
B.  Connect  the  display  screen  (7)  to 
handlebar and controller (6) using 4 sets 
of  Half-round  bolt  M10X20(A8),Flat 
washers

φ10(

C2).(Attention:  To  align 

screw hole)(See figure 5)

 

 

 
 
 
 
 

6. Assembling motor left & right cover 

A.Tighten all the assembling bolt. 
B.Install motor left cover (24) to left motor 
cover  (23)  of  base  frame  (1)  using  1pcs 
Crosshead  self-lock  bolt  ST4X30  (A9)  in 
front  and  3pcs  Crosshead  self-lock  bolt 
ST4X16 (A17) to tighten. 
C.Install motor right cover(25) to left motor 
cover(23)  of  base  frame  (1)  using  1pcs 
Crosshead  self-lock  bolt  ST4X30  (A9)  in 
front  and  3pcs  Crosshead  self-lock  bolt 
ST4X16(A17) to tighten.(See figure 6) 

Summary of Contents for TRX 9000

Page 1: ...Ed 10 18 Rev 00 Cod TOXPRFTRX9000 INSTRUCTION...

Page 2: ...3 Hardware and tool Explored drawing...

Page 3: ...und bolt M10X90 2 19 Non slip colloidal particles 84 A13 Crosshead bolt M8X70 8 20 Position nut 6 A14 Crosshead bolt M3X8 2 21 Shock absorption mat 4 A15 Crosshead bolt M5X40 2 22 Baffle plate 1 A16 C...

Page 4: ...upright tube 4 to base frame 1 using four sets of bolt M10X25 A4 Flat washers 10 C2 by side Attention to align screw hole with the upper surface Make sure the bolts to connect left upright tube and ba...

Page 5: ...ssembling display screen A Connect the signal wire from display screen to corresponding wire from controller Crowding the extra wire into controller B Connect the display screen 7 to handlebar and con...

Page 6: ...ne back to zero class turn off the power Treadmill can use after all the install adjustment is finished 1 Two feet stand on two side of belt put the other side clip from safety key to clip to clothes...

Page 7: ...able Button Icon Button Name Button Instruction Treadmill operation key instruction START Key Connect the power press START key the treadmill start running STOP PAUSE Key When treadmill running press...

Page 8: ...ram Incline direct key Build in 4 8 12 three incline direct shortcut keys Audio play key instruction Previous song volume down Press one time to back previous song long press to volume down Pause Stop...

Page 9: ...nutes of the countdown training RPE 2 30 minutes of the countdown training RPE 3 10 minutes of the countdown training P8 Strength Exercise Program Five level of strength exercise program LEVEL 1 Easy...

Page 10: ...3 4 1 88 4 05 9 1 7 F 4 F 4 265 8 3 1 6 2 1 4 1 8 2D 53 01 1 8 G 313 29 M1 1 3 2 3 1 3D 8 235381 26334 85 3 3 1 4R 21 26334 85 3 85 22 2 5 3D 6 322 21 6 3 1 6 23 21 6 09 G9 9B Q73 8 23 6 0 63 1 21 81...

Page 11: ...12 P1 Heart Rate Control Program P2 Custom Program P3 Manual Program P4 Target Setting Program P5 Hill Climbing Program...

Page 12: ...13 P6 Fat burn Program P7 Cardio Program P8 Strength Program P9 Fit test Program...

Page 13: ...When you wearing special HRC wireless heart rate chest belt do not play MP3 at the same time to avoid audio signal interfere with wireless heart rate 4 1 6 Program Matrix graphics and body mass index...

Page 14: ...m other audio source 6 2 Local music playing Put U disk into right USB interface to play the music from U disk 7 Maintenance function The treadmill have been Pre lubricated before leave factory it is...

Page 15: ...left and right bolts in rear roller with hex spanner If the belt is deviation to left clockwise rotate the left bolt If the belt is deviation to right counterclockwise rotate the right bolt It is bet...

Page 16: ...GARLANDO SPA Via Regione Piemonte 32 Zona Industriale D1 15068 Pozzolo Formigaro AL Italy contact toorxprofessional it www toorxprofessional it...

Reviews: