29
9. Press [
▲
] or [
▼
] key to
switch to the page of sight
distance and height of
stakeout point, then press
[ENT].
10. Press [REP] to start a new
stakeout job and start over
backsight point surveying.
Press [ENT] to continue
stakeout measurement.
Press [ESC] to exit.
[ENT]
S Dist: 26.78m
G.H: 22.90m
S.O G.H
REP: New Meas
ENT: Continue
ESC:
Exit
3.3 S.O H.D (Stake out Height Difference)
According to the inputted height difference H which calculated from known point A
and point B, system can measure out the corresponding point B, the measurement
result will not be saved.
Operating Procedures
Operation
Display