31
9. INSTALLING THE IP-S3 CUBE
LED display
LED status is described in the table below.
For all errors, except GNSS initialization, follow the steps in "Resetting the Timing Box" below.
For descriptions of errors, see the Mobile Master Field Instruction Manual.
Resetting the timing box
1. Continuously press the System Reset button until the Switch LED blinks slowly.
2. Release the system reset button. The Switch LED blinks rapidly until the timing box is reset.
After resetting is finished, the timing box restarts.
Clearing NVRAM (Initializing GNSS)
1. Continuously press the NAVRAM Clear button until the Switch LED blinks slowly.
2. Release the NVRAM Clear button. The Switch LED blinks rapidly until NVRAM is cleared.
After NVRAM is cleared, the timing box restarts.
LED
Indication
Contents
Status
Solid red
Startup
Solid orange
Sensor is being initialized.
Solid green
Operating properly
Green blink
Collecting data
Blinks red two times
System error
Blinks red three times
GNSS
initialization
error (Clear NVRAM.)
Blinks red four times
IMU error
Blinks red five times
Scanner data error
Blinks red six times
Scanner synchronization error
LAN
Solid green
During Ethernet connection to
timing
box from
each sensor
Switch
Solid green
Within 4 seconds
after
the switch is pressed
Blinks green slowly
Within 4 - 8 seconds
after
the switch is pressed
Blinks green rapidly
Instrument reset or NAVRAM is clearing
GNSS
Blinks red
Surveying is not performed
Blinks green
Tracking GPS satellites:
The blinking times indicate the number of
satellites being tracked.
Blinks orange
Tracking GLONASS satellites:
The blinking times indicate the number of
satellites being tracked.