background image

11 

Step 3   

Insert  the cable of the motor2  and alarm lamp cables into the control box through middle strain relief. Then 

repeat step 2. 

Step 4 

Insert other cables into the control box through rightmost strain relief. Then repeat step 2. 

 

CAUTION: 

Make sure the cable outlet hole in the Control Box is always down during installation so as to drain 

off the water. 

 

 

 

Connection of Power Supply 

      

WARNING: NEVER connect the gate opener 

to the power supply before all the installations 

have been done.   

Connect the power supply to the Control Box refers to 

the following illustration. 

NOTE:   

1. Use copper conductors to connect to the power 

supply terminals.   

2.  The wire (not provided) size should be at least 

0.75mm2 (18AWG) which is intended to connect the 

power supply. 

3. Run the wires in conduit to the control box to 

prevent damage to the wires from lawn mowers, weed 

eaters and grazing animals. 

4. The 

fuse in the control board is interchangeable. A 10a, 250vac, Φ5*20mm fuse is suitable to the control 

board. 

 

 

Connecting of the Control Board 

Actuator 1 

Insert the stripped cable wires into the appropriate terminals on the opener terminals block. The red wire should 

be inserted into the “

” 

terminal, the black wire into “

MOTOR1-“

, the blue wire into 

ULT1

, the green 

wire into 

COM

, and the thin yellow wire into 

DLT1

 terminal. 

 

Actuator 2 

Similar as the connection of 

Actuator 1

, insert the stripped cable wires into the appropriate terminals on the 

opener  terminals block.  The red wire should be inserted into the “

” 

terminal, the black wire into 

MOTOR2-“

, the blue wire into 

ULT2

, the green wire into 

COM

, and the yellow wire into 

DLT2

 terminal. 

 

NOTE:

 

For dual gate mode, actuator 1 must be used for master gate. Master gate would open first and 

close last. If the gate opener is installed for “PUSH TO OPEN”, then the P2 setting of the control board 

must be set to “11” (Factory default setting is 00). 

 

Summary of Contents for AT602

Page 1: ...VER 20a AT602 Please read and follow all warnings precautions and instructions before installation and use Never connect the solar panel to the control board directly to charge the battery Periodic ch...

Page 2: ...on for Installation 6 Install the Gate Opener on the Gate 6 Mounting the Control Box 10 Connection of Power Supply 11 Connecting of the Control Board 11 How to Program or Erase the Remote 13 How to Us...

Page 3: ...destrian access shall be located such that persons will not come in contact with the moving vehicular gate 8 Pedestrians should never cross the pathway of a moving gate The gate opener is not acceptab...

Page 4: ...er or other underground utility lines contact underground utility locating companies BEFORE digging SAVE INSTRUCTION 14 Do not permit children to play on or around the gate and keep all controls out o...

Page 5: ...Accessories Parts List Available at TOPENS Store Tools Needed Power Drill Tape Measure Open End Wrenches 14 17 or Adjustable Wrenches Wire Strippers C Clamps small medium and large Level Hacksaw or He...

Page 6: ...al Single gate running mode Adjustable opening closing interval between master and slave gate Stop in case of obstruction during gate opening Reverse in case of obstruction during gate closing Built i...

Page 7: ...n Overview Pull to Open Gates Important The second gate opener cable should be put into the PVC conduit not provided which is buried underground This protects the cable from lawn mowers and string tri...

Page 8: ...ckets to wooden posts a larger size washer or metal plate should be used between the bolts and the wooden post to ensure the stability of the fastening hardware If the post is smaller than 6 diameter...

Page 9: ...te opener insert the release key and turn the key 90 clockwise This releases the motor and allows the push pull rod to be manually extended and retracted To restore normal operation turn the key 90 co...

Page 10: ...f there is not at least 2 5cm of clearance or if the opener and the Post Pivot Bracket are binding rotate the Post Pivot Bracket and or move the Post Bracket Assembly to obtain the minimum clearance a...

Page 11: ...ach bolt with one 10 washer one 10 lock washer and one 10 nut 9 Attach the gate brackets to each gate by inserting two M10 x 75 bolts through the gate brackets and the drilled holes in the gates Faste...

Page 12: ...s waterproof designed for safety reason and a longer service life it is recommended to install the control box inside a secure surface and at least 100 cm 40 inches above the ground to avoid being flo...

Page 13: ...awn mowers weed eaters and grazing animals 4 The fuse in the control board is interchangeable A 10a 250vac 5 20mm fuse is suitable to the control board Connecting of the Control Board Actuator 1 Inser...

Page 14: ...12...

Page 15: ...LACK wire of the external receiver should be connected into the 16 terminal The RED wire of the external receiver should be connected into the 13 terminal Wired Keypad 24VDC optional The RED wire of t...

Page 16: ...e Button B is designed to realize midway function refer to more details in our TOPENS sliding gate opener manual So it is must program button A with sliding gate opener while you may program either C...

Page 17: ...ital Display which means gate opens out from the property push to open Press the FUNC button to store the data when the master slave gate is chosen The Digital Display will indicate P3 Now PUSH PULL T...

Page 18: ...is adjusted by pressing INC and DEC buttons respectively The Digital Display will show 1 9 which indicates the stall force levels 1 means the minimum force and 9 is the maximum force Each time you pr...

Page 19: ...iod of soft start You can press the INC or DEC button to set the period of soft start There is 1 9 seconds available in setting Press the FUNC button to store the data when the period is set The Digit...

Page 20: ...ar the actuator retracts It will retract to the end when using Adjust Limit switch B to decide how far the actuator 2 extends Use a screwdriver to loosen the screw of Limit Switch B slide Limit Switch...

Page 21: ...ff and allow transformer to cool for several minutes then reset Replace the transformer if the symptom still exists 3 Check the fuse in the control board Replace the fuse if necessary Opener powers up...

Page 22: ...UE GREEN YELLOW wires of the arm are not shorted 2 Limit switch of the arm is faulty Replace the limit switch as necessary Gate opens closes or stops on its own 1 Please make sure the P2 setting of th...

Page 23: ...21 Quick Setting Guide...

Page 24: ...22...

Page 25: ...23...

Page 26: ...24...

Page 27: ...e do not hesitate to contact us E mail support topenstool com Kindly include your Product Model Purchasing Date Site Order and your contact information All your concerns will be replied within 24 hour...

Reviews: