2
•
Position at least one visible indication device, and fix a Warning sign to the structure.
•
The factory declines all responsibility with respect to the automation safety and correct operation when
other supplier
’
s components are used.
•
Only use original parts for any maintenance or repair operation.
•
Do not modify the automation components, unless explicitly authorized by the factory.
•
Instruct the product user about the control systems provided and the manual opening operation in case of
emergency.
•
Do not allow persons or children to remain in the automation operation area.
•
Keep radio control or other control devices out of children
’
s reach, in order to avoid unintentional automation
activation.
•
The user must avoid any attempt to carry out work or repair on the automation system, and always request
the assistance of qualified personnel.
•
Anything which is not expressly provided for in the present instructions is not allowed.
•
Before installing the gate opener, check that all moving part as well as the sliding gate is in good mechanical
condition, correctly balanced and opens and closes properly.
•
Save these instructions for future use.
Preparation for Installation
Before proceeding to your opener installation, check if your gate structure is in accordance with the current
standards, especially as follows:
The gate sliding track is linear and horizontal, and the wheels are suitable
,
the gate should be mounted and
moving freely. Check that the structure is sufficiently strong and rigid, Make sure that the gate is plumb and
level. The fence posts must be mounted in concrete. The gate does not bind or drag on the ground.
•
The opening and closing gate stops are positioned.
WARNING:
Remember that control devices are intended to facilitate gate operation, but can not solve
problems due to any defects or deficiency resulting from failure to carry out correct installation or maintenance.
Take the product out of its packing and inspect it for damage. Should it be damaged, contact your dealer.
Remember to dispose of its components (cardboard, polystyrene, nylon, etc.) according to the current
prescriptions.
Refer to the following Figures for gate installation.