User guide BIOTOPLING-3BT
________________________________________________________________________________________
_____________________________________________________________________________
-- 28 --
TOPLING
JUNE 2012
3BT 25-50 kW
Figure 9. Principal diagram of boiler operation
K1 – maximum boiler temperature, K2 – initial pellet feeding time, K3 – duration of first
incineration, K4 – fan power at incineration, K5 – operation time of feeder conveyor, K6 – break
of feeder conveyor, K7 – fan power at burning, S1 – time of initial blow out, S2 – fan power at