User guide BIOTOPLING-3BT
________________________________________________________________________________________
_____________________________________________________________________________
-- 29 --
TOPLING
JUNE 2012
3BT 25-50 kW
at blow out, S3 – fan power at initial feeding, S4 – early involvement of the heater, S5 –
duration of second incineration, S6 – duration of stabilisation phase, S7 – operation time of
feeder conveyor at stabilisation, S8 – break time of feeder conveyor at stabilisation, S9 – fan
power at stabilisation, S10 – period of stabilisation prolongation, S11 – time for firebox
cleaning, S12 – fan power at firebox cleaning, S13 – delay of boiler switching off after the
room thermostat is disconnected, S14 – fixed limits for firing, S15 – required increase in
temperature of flue gases, S16 – minimum temperature of flue gases, S17 – allowed flue gas
temperatures drop, S18 – the beginning of a reduced dosing regimen, S19 – exceeding factor,
S20 – difference for the boiler operation, S21 –temperature for the pump startup, S22 –
difference for pump operation, S23 – maximum temperature of the boiler, S24 – difference
between the boiler and the furnace.
NOTE
These instructions must be followed to ensure safe and proper installation,
operation and maintenance of the boiler. Anyone who install, operate and
maintain the boiler must carefully read this manual before using the boiler and
properly treat it. Ignoring this instruction may lead to invalidating the warranty.
FIRE RISK
No flammable materials or liquids should be kept in the immediate vicinity of the
boiler.
RISK TO LIFE
Insufficient air supply to the plant can result in exposure to hazardous flue gases in
a room where the boiler is placed. It is necessary to make sure that openings for
fresh air and exhaust waste are not reduced or closed. If this problem is not