M200
18
instructions for installation
DOUBLE LEAF INSTALLATION
DOUBLE LEAF OPERATION
Perform the mechanical installation and the electric wiring assuming the two leaves would be independent, following page
6 in presence of articulated arm or page 8 sliding arm or page10 elbow arm.
The Double leaf operation has a MASTER and a SLAVE leaf. The MASTER leaf is the first one to OPEN.
ADDITIONAL CONNECTIONS AND SPECIFIC PARAMETERS SETTING
• Connect the MASTER and SLAVE boards
by following the wiring diagram on the right
•
Make sure the operators are installed cor
-
rectly and the door leaves are in CLOSE
position
• Set parameter as 1 on MASTER and 2
on SLAVE
• Set independently for each wing the pa-
rameters 101,102,103,104,105 (related to
weight, width, wall depth, sensors logic for
activation and safety) as shown in page 21
•
Following the instructions on page 17, per
-
form the learning process of the MASTER
door leaf first and the SLAVE door leaf
later; during the SLAVE door leaf learning
process, the MASTER one will automati
-
cally move to OPEN position.
+24V
Seriale B
GND massa
Seriale A
1
2
3
5
1
2
3
4
5
1
2
3
4
5
S
CHEDA
ELETTRONIC
A
M
ASTER
S
CHEDA
ELETTRONIC
A
SL
AV
E
MASTER BOARD
SLA
VE BOARD
-
*
* view disabled button connection Servo Assisted Manual Opening page 29
SLAVE LEAF
MASTER LEAF
Summary of Contents for M200
Page 20: ...M200 20 instructions for installation LIST OF ERROR MESSAGES AND NOTICES ...
Page 28: ...M200 28 instructions for installation EC DECLARATION OF INCORPORATION ...
Page 29: ...29 instructions for installation M200 ...
Page 30: ...M200 30 instructions for installation ...