18
instructions for installation
DOUBLE LEAF OPERATION
Perform the mechanical installation and the electric wiring assuming the two leaves would be independent, following page
6 in presence of articulated arm or page 8 sliding arm or page10 elbow arm.
The Double leaf operation has a MASTER and a SLAVE leaf. The MASTER leaf is the first one to OPEN.
ADDITIONAL CONNECTIONS AND SPECIFIC PARAMETERS SETTING
•
Connect the MASTER and SLAVE boards
by following the wiring diagram on the right
• Make sure the operators are installed cor-
rectly and the door leaves are in CLOSE
position
• Set parameter as 1 on MASTER and 2
on SLAVE
• Set independently for each wing the pa-
rameters 101,102,103,104,105 (related to
weight, width, wall depth, sensors logic for
activation and safety) as shown in page 21
•
Following the instructions on page 17, per
-
form the learning process of the MASTER
door leaf first and the SLAVE door leaf
later; during the SLAVE door leaf learning
process, the MASTER one will automati
-
cally move to OPEN position.
+24V
Seriale B
GND massa
Seriale A
1
2
3
5
1
2
3
4
5
1
2
3
4
5
S
CHEDA
ELETTRONIC
A
M
ASTER
S
CHEDA
ELETTRONIC
A
SL
AV
E
DOUBLE LEAF INSTALLATION
S200
MASTER BOARD
SLA
VE BOARD
-
*
* view disabled button connection Servo Assisted Manual Opening page 29
Summary of Contents for S200
Page 20: ...20 instructions for installation LIST OF ERROR MESSAGES AND NOTICES S200 ...
Page 26: ...26 instructions for installation PRE WIRED ELECTRIC CONNECTIONS S200 ...
Page 30: ...30 EC DECLARATION OF CONFORMITY instructions for installation S200 ...